Kitchen Remodeling

A kitchen needs more trades than almost any other room: plumbing, electrical, drywall, cabinets, counters, tile, floors and paint. We do all of it as one job, so the pieces go in in the right order.

Get a Free Quote

Modern kitchen white oak quartz

Refresh or full remodel

Not every kitchen needs to be gutted. Sometimes new counters, a backsplash, better lighting and paint are enough. Other kitchens need a new layout, because the sink, stove and fridge are in awkward spots or a wall cuts the kitchen off from the rest of the house. We'll look at yours, ask what bugs you about it, and quote the work that fixes that.

What goes into a kitchen remodel

It starts with the layout: where the sink, range, fridge and dishwasher go, and whether there's room for an island. Then the rough work happens. Our plumbers move the sink or add a dishwasher line and replace old pipes while the wall is open. Our electricians add the circuits a kitchen needs, plus pot lights and under-cabinet lights. In older houses, the panel often has to be upgraded to carry it all.

After that, new drywall goes up and the cabinets go in, set level and square. Stone counters are measured once the cabinets are installed. Then the backsplash, the floor and the paint finish it off.

Range hoods

Our climate is damp, and the steam and grease from cooking end up on the windows and walls if they stay in the house. A range hood should vent outside, not just recirculate the air, and it should be the right size for the stove. If the hood is moving or getting bigger, we plan the duct route through the wall or ceiling at the start.

Condo and townhouse kitchens

In a strata building, you'll usually need the council's approval before the work starts. You'll also need to book the elevator for deliveries and keep noisy work to certain hours. In a concrete building, the plumbing and venting have to connect to shared pipes and ducts, so there are limits on where the sink and hood can go. We plan the layout around what your building allows and write up the description of the work for your strata.

How long it takes

A refresh with new counters and finishes can take a week or two. A full remodel with a new layout takes longer. Most of the waiting is for cabinets and counters, so we order them before we tear anything out. That way you're not stuck without a kitchen while the cabinets are on back order. You'll get the schedule with the quote.

Thinking about a new kitchen?

Tell us what you don't like about the kitchen now, whether you want to change the layout, and whether it's in a house, condo or townhouse. A few photos help us come prepared.